Days 1–10: Design freeze. Everything downstream depends on a frozen design, so the first two weeks resolve it: site drawings reviewed, nozzle layout and effect positions fixed, hydraulic and electrical engineering completed, and the show concept agreed — effect palette, music direction, lighting scenes. The discipline that protects the schedule lives here: changes requested after design freeze are scheduled as additions, not absorbed silently into the critical path.
Days 11–40: Manufacturing. Fabrication runs in parallel tracks — piping and manifold assembly, pump and valve installation, control cabinet build, LED fixture preparation, and stainless steel components finished to the grade specified for the site's water and climate. Each track carries inspection checkpoints, and every sub-system is bench-tested before it meets the others.
The gate most buyers never see: factory pre-testing. Before anything ships, the assembled system runs at the Wuxi facility. Pumps, valves, lights and control hardware operate together; show software drives the physical fountain, not a simulation; defects are found with a screwdriver in hand rather than on a foreign site with a container of tools. For export projects, this gate is the single largest schedule-risk killer — problems caught here cost days, not weeks.
Days 41–55: Shipping and site preparation. Equipment packs into containers with protection rated for ocean freight and travels with complete documentation — packing lists, electrical schematics, installation drawings — so the receiving site can prepare civil works, power supply and pump rooms in parallel rather than waiting. On overseas projects, installation supervision arrives with the equipment.
Days 56–60: Installation supervision and commissioning. On site, WJ Fountain engineers supervise installation, verify electrical and hydraulic connections, fill and balance the water system, then commission the show: nozzle tuning, music-effect synchronization, lighting scene calibration, and repeatability runs until the program performs identically every night.
The project closes with operator training and handover of the full documentation set — including maintenance schedules and spare-parts guidance.
Why the standard holds. A 60-day promise survives only if three disciplines are non-negotiable: design freeze enforcement, factory pre-testing before shipment, and documentation that lets site work run in parallel. Remove any one and the schedule quietly becomes an aspiration.
What it means for buyers. A codified standard converts delivery from a promise into a checkable process. When comparing suppliers, ask to see the stage gates, the factory test protocol and the handover documentation list — the answers reveal which timelines are engineered and which are improvised.
Wuxi Wenjin Fountain Engineering delivers Music Fountain, dry floor fountain, Digital Water Curtain and water screen show projects worldwide under its 60-working-day concept-to-installation standard for standard projects.
September 11, 2023
July 01, 2023
Email to this supplier
September 11, 2023
July 01, 2023
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.